Seven to twelve days with express shipping, or eighteen to twenty-five with free shipping, from the moment you approve the drawing, and that already includes getting it to you. Large or complex pieces sit at the top of that range.
The clock does not start when you place the order. It starts when you say yes to the drawing, which means the step most likely to move your deadline is the one in your hands.
What actually happens
You send the details. Wording or a logo, a rough size, and your date if you have one. No payment at this stage.
We send a drawing. A designer draws your sign to scale with exact dimensions and a firm price. Expect it back in thirty minutes to three hours on a business day.
You approve it. Change the wording, the font, the size, the colors. Revisions are unlimited and there is no design fee at any point.
We build and ship. Seven to twelve days to your door with express shipping, or eighteen to twenty-five days with free shipping. Express shipping brings the delivery leg down to four to six days if you need it.
If you are working to a date
Tell us the actual date, not the deadline you think we need. It changes what we recommend.
| Time before your date | Verdict | What to do |
|---|---|---|
| 35 days or more | Comfortable | Take your time over the drawing |
| 21 to 34 days | Workable | Approve promptly, consider express shipping |
| Under 21 days | Ask first | Talk to us before you order, not after |
The two things that cost the most time
Neither of them is production.
- ✗ A slow approval. The build queue cannot start without it, and a drawing sitting unread in an inbox is the most common cause of a missed date.
- ✗ A logo that arrives as a low resolution screenshot. It has to be redrawn before we can quote properly, which adds a round trip before the clock even starts.
Send the best version of your artwork you have, in any format, and reply to the drawing when it lands. Those two habits are worth more than any expedite.
Most people order later than they meant to and then ask whether it can be rushed. The honest answer is that the part we control is fairly fixed, and the part you control is not. If your date matters, get the drawing started now even if you are still deciding the wording, because revisions are free and the conversation is what moves first.
Send your wording and your date and we will tell you honestly whether it lands in time, before you pay anything.
Frequently asked questions
How long does a custom neon sign take to make?
Seven to twelve days with express shipping, or eighteen to twenty-five with free shipping, from the moment you approve the drawing, including delivery. Large or complex pieces sit at the top of that range. The clock starts at approval rather than at order, because nothing is built until the drawing is signed off.
How far in advance should I order for a wedding or event?
At least 35 days before the date is comfortable. Between 21 and 34 days is workable if you approve the drawing promptly and use express shipping. Under 21 days, ask us before ordering rather than after, because we would rather tell you it is tight than have you find out.
Can a custom neon sign be rushed?
Express shipping shortens the delivery leg to four to six days, which helps. The build itself is harder to compress, because each run of tube is bent by hand for your specific design. The fastest thing you can do is approve the drawing quickly, since that is where most lost days actually go.
How quickly will I get the design drawing?
Thirty minutes to three hours on a business day. It is a scaled drawing with exact dimensions and a firm price, and there is no charge for it or for any revisions afterwards.
Does the quoted time include shipping?
Yes. Both figures are to your door, not to the loading bay. Express shipping replaces the standard delivery leg with a four to six day one.
We have made neon since 1998, and we still make it ourselves. If something here does not answer your question, ask us.




