Your logo is not a stock letter set
Nothing in this grid carries your name yet, and it is not meant to. Send the logo with a photo of the actual facade, not a rendering on a neutral background, and we will come back with dimensioned shop drawings and a firm price. Those drawings are what your permit application and your installer both need.
Send my logo for drawingsNo cost, no obligation. If the construction you asked for is wrong for that wall, we will say so before you spend anything.
Opening on a fixed date? Check it before you design
Storefront signage misses deadlines for one reason more than any other: the permit, not the fabrication. Tell us the date you need to be lit and we will tell you honestly whether it fits.
- ✓Fabrication and shipping runs up to 30 days from drawing approval
- ✓Permit review is set by your municipality and commonly adds several weeks
- ✓Landlord sign criteria approval happens before either of those
- ✓Installation has to be booked, and is not included
Permit timelines are set by your municipality and are outside our control, so treat this as a planning guide rather than a commitment.
Four decisions before you order
The questions that actually change the drawing.
Why this is the storefront default
A translucent acrylic face lit from inside the channel, held by a trim cap around the perimeter. It lights evenly, reads from a moving car, matches brand colour precisely, and is the construction most tenant sign criteria already assume. Boring in the way good work boots are boring.
Compare all four types →How tall the letters need to be
Letter height follows viewing distance, not wall width. For a sign facing the viewer, roughly 30 feet of readable distance per inch of letter height is the working figure. The one-inch-per-ten-feet rule quoted everywhere else is the harsher index for signs mounted flat alongside passing traffic, and applying it here makes every storefront sound like it needs letters three times taller than it does.
Work it out with real distances →Raceway or flush, and who decides
Flush mounting fixes each letter to the facade individually and looks cleanest. A raceway carries them on one bar, which means a single point of building penetration. Landlord policy genuinely conflicts between properties: some mandate a raceway, others ban it and require a slim wireway. Read your sign criteria rather than assuming an industry norm.
The permit takes longer than the build
Fabrication and shipping run up to 30 days from drawing approval. Permit review is set by your municipality and commonly adds several weeks on top, and landlord approval happens before either. A landlord written approval is not a substitute for a permit. Get the criteria first, design to them second, file third.
What the permit process involves →