Opening on a fixed date? Check it before you design
Exterior signage misses deadlines because of the permit, not the fabrication. Interior lobby signs usually skip that step entirely. Tell us the date you need to be lit and we will tell you honestly whether it fits.
- ✓Fabrication and shipping runs up to 30 days from drawing approval
- ✓Exterior work needs a permit; interior lobby signs usually do not
- ✓Landlord sign criteria approval happens before either of those
- ✓Installation has to be booked, and is not included
Permit timelines are set by your municipality and are outside our control, so treat this as a planning guide rather than a commitment.
Four decisions before you order
The first one eliminates halo more often than budget does.
Halo only works if the wall works
The glow lands on the surface behind the letters, so that surface becomes part of the sign. Clean plaster, flat stone and brushed metal all look excellent. Rough brick, busy tile, or a wall with a downpipe running through it means you have spent a lot of money lighting up your building's flaws. This rules out halo more often than budget does.
Standoff distance is a design lever
The letters sit off the wall on standoffs, commonly around 1 to 1.5 inches and sometimes up to 2. Shorter gives a tighter, brighter halo. Longer gives a softer, wider, dimmer one. It also means the sign projects from the wall, so check your landlord projection limit before the distance is fixed on a drawing.
It reads worst at distance
A halo letter is a silhouette floating in a glow, with no lit face to carry across a car park. That is exactly why it looks expensive up close and disappoints from the road. Lobbies, reception walls, clinics and studios are where it belongs. If people need to read your name from a moving car, front-lit is the safer build.
See front-lit instead →The permit takes longer than the build
Fabrication and shipping run up to 30 days from drawing approval. Permit review is set by your municipality and commonly adds several weeks, and landlord approval happens before either. Interior lobby signs often skip the permit entirely, which is one practical advantage of halo work that lives indoors.
What the permit involves →